Shot of the highpoint completed building
© Mike O'Dwyer
Highpoint site image
AKT - Matthew Leeks
Rooftop render
© AKT II
Render 03
© AKT II
Site photo
© Mace

Highpoint

In this 45-storey skyscraper, a flagship of the wider Elephant & Castle regeneration project, we teamed up with Axis Architects, Rogers Stirk Harbour + Partners and developers Mace to create an icon. Replacing a disused hotel, it is now one of the tallest residential blocks of its kind in the capital.

The scheme provides 470 new mixed-tenure apartments alongside local amenities in a new public square and a 180-seat theatre; the tower block is octagonal in shape, providing the majority of plots with corner balconies, and this is partnered with a pioneering CLT block of 8 storeys.

The environment was a key driver in the concept, and communal roof gardens with spectacular views, a number of green roofs and 500 bicycle spaces were incorporated from the outset to further the development’s green credentials.

A number of innovative construction techniques were considered for the tower; its repetitive, symmetrical nature gave us scope to develop a bespoke system and a high-speed construction method. The resulting framing system works holistically as all elements contribute to the lateral stability system as well as providing vertical support. An arrangement of four internal concrete blade walls provide buttressing to the central core, whilst every floor slab acts as an outrigger engaging eight perimeter blade walls which are also articulated within the façade, providing an aesthetic which is true to the structural behaviour of the tower.

The balconies extend over 4 m from the perimeter floor plates, propped by corner cables which provide the necessary damping against induced vibration. These cables then extend to the top of the tower supported by the ‘crown’, again providing a visual link between the architectural language of the development and the structural systems.

The 8-storey podium block is the product of extensive research into prefabrication and modular construction; it was originally conceived as a timber cassette system then a precast concrete frame, but a timber approach was eventually reconsidered, and thus the employment of a cross laminated timber (CLT) construction was decided. This allowed for prefabrication that led to a rapid construction time and limited the manual labour required on site.

High-rise residential block at the heart of ongoing regeneration in Elephant and Castle

LOCATION
London, UK
CLIENT
Mace, Realstar Group
ARCHITECT
Axis Architects, Rogers Stirk Harbour + Partners (concept)
PROJECT VALUE
£ 100 million
COMPLETION
2017
AWARDS
  • 2018 Offsite Awards – 2× Highly Commended