Burlington Danes Imaging Centre.

As Imperial College continued to develop their amenities to attract the brightest minds, they approached us to work alongside architects Sheppard Robson to create a new medical research centre in partnership with GSK. This tiered structure, close to the existing Queen Charlotte Hospital in London’s Hammersmith, houses the latest imaging technology behind sleek façades of stainless steel and glass.

A new medical research centre with a tiered structure and sleek façades

Location
London, UK
Client
Imperial College
Architect
Sheppard Robson
Project Value
£50 million
Floor Area
13,000 m²
Status
completed 2007
Expertise
Structures

Restrictions resulted from the site’s urban location, and included potential issues with working hours, crane oversailing and party wall agreements. The site had previously been home to a school, empty for several years, and still held several buildings that were to be demolished to ground slab level.

We advised that groundworks beneath this should allow for the removal of obstructions and possible existing basements prior to the installation of a new basement. Piled foundations were adopted across the scheme due to the irregular grid arrangements above, which varied according to use.

Superstructure works comprised two new concrete flat slab and column buildings, long and narrow in plan and linked via steel truss link bridges across a central, steel-roofed atrium. The two-storey atrium is fully glazed with self-supporting panels, and separate steel trusses bearing the roof loads.

The first block, on the southern side of the site, houses the building’s laboratories, the brief for which was to provide spaces that were as flexible and future-proof as possible; the adjacent building comprises associated office and administration space.

A striking feature is the steel-framed epistitial wall that provides an accessible and semi-exposed service route between high-level plant and laboratories at each level, whilst also aiding ventilation and acting as a thermal buffer. Glass panels were originally considered, but were replaced by perforated stainless steel, with each panel supported vertically and laterally by its connection to the access walkway, which is in turn supported by steel hangers above each storey.

Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Town FC
Stadium.
 
 
St Pancras Campus thumbnailSt Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Malaika
School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
3290_HighRes_render_N9_hdThe
Gaumont.
 
 
5448_N8_hdCrinkle-Crankle
Concrete.
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.
 
Roatan
Prospera.