Howe Dell Primary School.

Extensive elevations of sustainable timber cladding set Howe Dell School’s new two-storey building apart from its wattle and daub predecessor, and highlight the intention of the client to create a BREEAM ‘Excellent’-rated building using some of the latest technologies.

A two-storey, BREEAM ‘Excellent’-rated school extension using new technologies

 

Location
Hatfield, UK
Client
Hertfordshire County Council
Architect
Capita Ruddle Wilkinson
Project Value
£10.2 million
Status
completed 2008
Expertise
Structures

Built around two miles away from the site of the existing school, the new scheme comprises one long, rectangular structure linked by a footbridge to a separate single-storey hall intended to serve the local community. To the south of the building we positioned the teaching areas, with the pastoral and administrative facilities situated to the north, making full use of the site to provide a learning environment.

We designed a steel frame for the main building, which was chosen for its sustainability credentials as well as speed of construction and potential cost savings. The lightweight structure and good ground conditions enabled us to specify a reinforced concrete raft as the most economical solution. The adjacent community hall comprised load-bearing masonry walls, also bearing onto a raft foundation.

For the floors of the main building we specified the Tarmac Thermodeck system, incorporating hollow concrete floor slabs with high thermal mass, through which heated or cooled air could pass and circulate. This formed part of an innovative ‘interseasonal heat transfer system’, whereby an underground pipe system captures solar heat energy during the warmer months, and stores it for circulation through the building via the hollow floors in the winter. The opposite was also possible, with cooling drawn from the ground in lower temperatures and used to condition the air in the summer.

Elsewhere we incorporated a green roof, and wind turbines and photovoltaic cells. We specified high thermal performance windows, maximising natural light into classrooms and halls. Cladding varied between timber cladding and render onto blockwork for the main building and load-bearing blockwork masonry on the community hall building.

Awards.

ECO Green Flag accreditation

Selected by BREEAM as one of eight projects used during the development of the ‘BREEAM for Schools’ initiative

2008 Building Magazine Sustainable Building of the Year – Runner-up

2008 ACE Awards ‘Sustainable Technologies’ – Highly Commended

Dubai
Creek
Footbridge.
 
The
Red Sea
 
Project.
Oxford
North
 
 
1–4 Marble
Arch.
 
 
Athletes'
Village.
 
 
Arding
&
Hobbs.
 
Grosvenor
Square.
 
 
Horizon
 
Building.
 
Canada
Water
Plot K1.
 
Cadogan
Place.
 
 
CASPAR
I.
 
 
Kivik
Pavilion.
 
 
One
Centaur
Street.
 
Nike
myThread
Pavilion
 
Museum
of the
History of
Science.
2-12
Symons
Street
 
Southwark
Gateway.
 
 
Brindleyplace
Café
 
 
Queen
Mary
Students'
Union.
30
Kensington
Church
Street
Burlington
Danes
Imaging Centre.
 
Bedford
Music
School
 
Royal
Holloway
Student
Residences.
Howe
Dell
Primary
School.
39-49
Wigmore
Street
 
1
Finsbury
Square
 
London
Bridge
Glass
Sculpture.
Hilton
London
Tower
Bridge.
Bishop Challoner
Catholic Collegiate
School.
 
Butterfield
Innovation
Centre.