engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

The Hub, Coventry University.

Part of Coventry University’s £150 million-redevelopment of its city-centre campus, the Hub provides a complete range of student services including food court, student union, 700-capacity arts space and touchdown learning spaces. We were charged with delivering an efficient yet striking structure befitting an iconic new building on this landmark site adjacent to the cathedral.

Cleverly arranged student facilities in Coventry University’s city-centre campus

Location
Coventry, UK
Client
Coventry University
Architect
Hawkins Brown
Project Value
£ 110 million
Status
completed 2011
Expertise
Structures

Though visually complex with bright colours and dramatic cladding patterns, the Hub utilised an RC-framed structure with in-situ post-tensioned flat slabs; efficient and inexpensive while providing excellent thermal mass for natural ventilation. The architect also envisioned exposed services with no suspended ceilings, providing a more industrial aesthetic.

At the heart of the structure was an efficient and flexible 9 m grid, although the building appears to be more elaborate as it deviates from the orthogonal along its northern and eastern elevations, where in plan the external walls flare outwards.

Recesses at ground floor level provide further visual complexity, creating colonnades supporting the building above. Yellow-painted tubular steel columns supporting the projecting floors above were arranged in a random array, and load transfer structures inserted above, integrated into the shallow permitted zone.

During procurement, rising steel prices prompted a design change to post-tensioned slab construction, which delivers slightly shallower slabs and significant savings on reinforcement.

Located within the building are six concrete cores providing both vertical circulation and structural stability. During the pre-stressing of the floor slabs, the cores were separated by voids, which were later filled, to avoid over-stressing. The double-height event space was designed for improved acoustic performance and constructed from 200 mm-thick concrete walls for sound attenuation. Because of the larger 14 m spans, the ceiling over the event space was formed from precast, pre-stressed slabs.

Rated BREEAM ‘Excellent’, the Hub incorporates eco-initiatives including greywater harvesting, solar water heating and groundwater cooling.

Awards.

2012 BCI Awards – Shortlisted

2012 RIBA Regional Award

2012 Considerate Constructors Bronze Award

Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Town FC
Stadium.
 
 
St Pancras Campus thumbnailSt Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Malaika
School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
3290_HighRes_render_N9_hdThe
Gaumont.
 
 
5448_N8_hdCrinkle-Crankle
Concrete.
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.
 
Roatan
Prospera.