engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

Water Hall Primary School.

Our thinking, as structural and civil engineers for this new build primary school in Milton Keynes, was as much about the build strategy as about the design solution. This complex project integrated many factors to deliver a cost-effective, buildable solution. Not least that the original primary school remained in use on site during the construction process.

New build school in Milton Keynes, comprising of masonry and timber-frame construction elements

Location
Milton Keynes, UK
Client
Milton Keynes Council
Architect
Architecture MK
Project Value
£6.7 million
Status
completed 2009

While children safely continued with their every day school life on one half of the site, the other half of their original school was carefully demolished. The new school was built and the children moved in, with the rest of the original building making way for a landscaped space.

Phased developments need front end thinking to ensure the whole project moves forward on site seamlessly. With a fast-track construction period, completion dates that were set in stone and a tight budget, advance thinking through all aspects of the project design and delivery was essential.

The new school comprises elements of load-bearing masonry and timber-framed structures, with curved façades enclosing a landscaped courtyard, providing a contemporary, welcoming new community building offering a safe environment where children can both learn and play. The sustainable building is constructed from natural materials including brick, timber and glulam and incorporates a SuDS drainage system together with a wind turbine. The roof of the sports hall is supported by six bow string glulam trusses each spanning 15 m. Glulam columns rise into ‘branches’ that in turn support a double height roof to enclose the nursery areas internally, while steel columns rise to support the over sailing roof to create shaded areas in the playground outside.

Awards.

2010 RIBA Award

2009 British Council for School Environments Award

Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Town FC
Stadium.
 
 
St Pancras Campus thumbnailSt Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Malaika
School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
3290_HighRes_render_N9_hdThe
Gaumont.
 
 
5448_N8_hdCrinkle-Crankle
Concrete.
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.
 
Roatan
Prospera.