engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

Water Hall Primary School.

Our thinking, as structural and civil engineers for this new build primary school in Milton Keynes, was as much about the build strategy as about the design solution. This complex project integrated many factors to deliver a cost-effective, buildable solution. Not least that the original primary school remained in use on site during the construction process.

New build school in Milton Keynes, comprising of masonry and timber-frame construction elements

Location
Milton Keynes, UK
Client
Milton Keynes Council
Architect
Architecture MK
Project Value
£6.7 million
Status
completed 2009

While children safely continued with their every day school life on one half of the site, the other half of their original school was carefully demolished. The new school was built and the children moved in, with the rest of the original building making way for a landscaped space.

Phased developments need front end thinking to ensure the whole project moves forward on site seamlessly. With a fast-track construction period, completion dates that were set in stone and a tight budget, advance thinking through all aspects of the project design and delivery was essential.

The new school comprises elements of load-bearing masonry and timber-framed structures, with curved façades enclosing a landscaped courtyard, providing a contemporary, welcoming new community building offering a safe environment where children can both learn and play. The sustainable building is constructed from natural materials including brick, timber and glulam and incorporates a SuDS drainage system together with a wind turbine. The roof of the sports hall is supported by six bow string glulam trusses each spanning 15 m. Glulam columns rise into ‘branches’ that in turn support a double height roof to enclose the nursery areas internally, while steel columns rise to support the over sailing roof to create shaded areas in the playground outside.

Awards.

2010 RIBA Award

2009 British Council for School Environments Award

Related Projects
Place
Lalla
Yeddouna
 
Banyaka
Lower
Basic
School
39
Victoria
Street
 
Jellyfish
Theatre
 
 
TNQ
 
 
 
Nottingdale Café
 
 
 
Smithfield
Market
 
 
The
Longest
Bench
 
Yalding
House
 
 
The
Hurlingham
 
 
Yaba
Housing
Prototype
 
Meadowhall
 
 
 
Chapter
Arts
Centre
 
Pond
Meadow
School
 
Cobblers
Lane
 
Primary School
Seven
Dials
Warehouse
 
Tyneside
 
Cinema
 
Firstsite
Colchester
 
 
Hampstead
School
 
 
Royal & Derngate
 
Theatre
 
Broadway
Cinema
 
 
Fawood
Children's
Centre
 
Gazzano
 
House
 
South
 
Essex
College
Westfield
Student
Village
 
Hotel
 
Saratoga
 
National
Gallery
of
Ireland
Nightingale
Place
 
 
Belgo
 
 
 
Ben
Pimlott
Building